Skip to content

Process

You run projects for a living. So do we.

A vague process is a red flag to a contractor, and rightly so. Here is the whole thing: five phases, what we deliver, what we need from you, what it costs when that is late, and how change orders work.

Phases

Five phases, each with a dependency.

The dependencies are the point. Every phase has something we need from you before it can close, and that is where projects slip.

01

1 week

Discovery

Segment, service area, bid-versus-lead mix, recruitment pressure. We inventory the certifications, safety statistics and project proof you already own — which is almost always more than you think.

What we need from you

  • A 90-minute call with whoever actually runs the jobs
  • Certification documents: COR, WCB, insurance, bonding
  • A list of projects worth featuring, with values and dates
  • Access to any existing analytics

Deliverable

Discovery brief, sitemap, keyword map

02

1–2 weeks

Architecture

Silos by service, sector and location. The project template gets designed here, along with the careers pathway and the capability profile. Nothing gets written until the structure is agreed.

What we need from you

  • Sign-off on the sitemap
  • Confirmation of which sectors and service areas matter
  • Your CRM or ATS details if we are integrating

Deliverable

Approved sitemap, wireframes, content plan

03

2–4 weeks

Design & content

Page designs and the copy that fills them, produced together rather than in sequence. Design without content is decoration; content without design is a document.

What we need from you

  • Project photographs — this is the usual bottleneck
  • One round of consolidated feedback per page set
  • Your safety statistics, if you are publishing them

Deliverable

Designed pages, written copy, one revision round included

04

2–3 weeks

Build

Mobile-first markup, schema, a hard speed budget, forms wired to your CRM, accessibility to WCAG 2.1 AA. Built on staging where you can see it as it happens.

What we need from you

  • Domain and hosting access
  • Final approval on content
  • Test contacts for form routing

Deliverable

Staging site, QA report, PageSpeed and accessibility results

05

1 week

Launch & handover

DNS cutover, redirects mapped from every old URL, analytics and conversion tracking verified, Search Console submitted. Then training so you can run it yourself.

What we need from you

  • A launch window that avoids your bid deadlines
  • Two hours for handover training

Deliverable

Live site, redirect map, training recording, documentation

What causes delays

It is almost always the photographs.

Nine builds out of ten that run long, run long for the same reason: we are waiting on project photography and certification documents. Everything else is schedulable. This is not.

If you do not have usable photographs, say so in week one and budget a half-day with a photographer at an active site. It costs less than most people expect, and the images pay for themselves across the website, proposals and recruiting.

Change orders

Stated up front, same as you would.

  • One revision round per page set is included in the quoted price.
  • Additional rounds, or new requirements added after sign-off, are quoted before any work happens. You approve in writing first.
  • Scope added mid-project — a new sector page, an extra integration — becomes a written change order with its own price and schedule impact.
  • We will not quietly absorb scope and then quietly miss the date. If something you have asked for pushes launch, we say so that day.

Timeline

What a realistic schedule looks like.

Typical project timeline by engagement size
Phase Foundation Growth Scale
Discovery 1 week 1 week 1–2 weeks
Architecture 1 week 2 weeks 2–3 weeks
Design & content 2 weeks 3–4 weeks 5–7 weeks
Build 1–2 weeks 2–3 weeks 4–6 weeks
Launch & handover 1 week 1 week 1–2 weeks
Total 6–7 weeks 9–11 weeks 13–20 weeks

These assume feedback within three business days and photographs available by the end of phase two. They are the schedule we plan to; they are not a guarantee, and we will tell you the day anything moves.

Questions about the process

What if we need it faster than that?

Sometimes possible, usually by cutting scope rather than compressing phases. If you have a bid or a trade show driving the date, tell us in the first call and we will build the plan backwards from it — often launching a smaller site on time and adding to it after.

Who is our point of contact?

One person, throughout. You will not be handed between an account manager, a designer and a developer, and you will not have to re-explain your delivery methods to each of them.

How much of our time does this take?

Around eight to twelve hours total across the project for a standard build: the discovery call, feedback rounds, gathering documents and handover training. The photography gathering is the part people underestimate.

What if we hate the design?

You see design directions before full pages are built, precisely so that a fundamental disagreement surfaces in week three rather than week eight. If we are still not aligned after the first revision round, we would rather have that conversation than build something you resent.

Do you work with our internal marketing person?

Happily, and it usually makes the project faster. We will agree who owns what in discovery so nobody is duplicating work or waiting on the other.

Start with the discovery call.

Forty-five minutes, no charge, no deck. We ask about your sectors, your bid-versus-lead mix and your hiring pressure, and you get a straight read on what is worth doing.